The LMA BOARD 2011 Considers:

Rather than an annual road project the LMA board is considering doing much larger areas of roads every several years.  This is being considered to take advantage of the economies of scale available with such scheduling.  Therefore the schedule below is not likely to be followed as outlined.

AS REVISED November 2008

YEAR ROAD NAME

2006 Landings Blvd--Heron Way to Eagles Point

2007 Kestral Parkway North—North Gate to US 41

2008 Landings Terrace, v Landings Court

2009 Starling Drive

2010 Cedar Bay Lane, Landings Blvd--Landings Circle to Heron Way

2011 Kestral Park Drive

2012 Pine Harrier Circle

2013 Kestral Parkway South--Landings Blvd to Landings Blvd (Entire Length)

2014 Kestral Parkway North--Landings Blvd to North Gate

2016 Pine Harrier Drive

2017 Landings Circle, Landings Place, Landings Point, Landings Drive and Landings Lake Drive

2018 Eagles Point Circle

2019 Heron Way

2020 Flicker Field Circle

2021 Kestral Park Lane, Kestral Park Terrace, Kestral Park Place

2023 Peregrine Point Circle North, Peregrine Point Circle West, Peregrine Point Circle East

2024 Peregrine Point Drive, Peregrine Point Way Peregrine Point Court

2025 Landings Blvd—Landings Circle to Landings Way

2026 Landings Blvd—Landings Way to Main Gate