The LMA BOARD 2011 Considers:
Rather than an annual road project the LMA board is considering doing much larger areas of roads every several years. This is being considered to take advantage of the economies of scale available with such scheduling. Therefore the schedule below is not likely to be followed as outlined.
AS REVISED November 2008
YEAR
ROAD NAME2006 Landings Blvd
--Heron Way to Eagles Point2007 Kestral Parkway North—North Gate to US 41
2008 Landings Terrace, v Landings Court
2009 Starling Drive
2010 Cedar Bay Lane, Landings Blvd
--Landings Circle to Heron Way2011 Kestral Park Drive
2012 Pine Harrier Circle
2013 Kestral Parkway South
--Landings Blvd to Landings Blvd (Entire Length)2014 Kestral Parkway North
--Landings Blvd to North Gate2016 Pine Harrier Drive
2017 Landings Circle, Landings Place, Landings Point, Landings Drive and Landings Lake Drive
2018 Eagles Point Circle
2019 Heron Way
2020 Flicker Field Circle
2021 Kestral Park Lane, Kestral Park Terrace, Kestral Park Place
2023 Peregrine Point Circle North, Peregrine Point Circle West, Peregrine Point Circle East
2024 Peregrine Point Drive, Peregrine Point Way Peregrine Point Court
2025 Landings Blvd—Landings Circle to Landings Way
2026 Landings Blvd—Landings Way to Main Gate